Scheduling and Project
Controls
Project management control
can only be achieved when cost, schedule, and technical
objectives are clearly documented, realistically derived,
and deliberately managed. Project schedule development
is one of the most important processes in your project's
overall plan development. However, a project will generally
never follow the plan exactly and even the most well
thought-out project schedules will inevitably exhibit
variances between the planned and actual performance.
Therefore, in order to prevent these variances from
significantly disrupting the project, a process for
continual control and monitoring must be implemented
from the project's outset. Synergen Consulting is able
to assist our clients at any stage of a project, as
we can not only measure current performance status but
also forecast potential problems. Regulating variances
can mean the difference between the success and failure
of your project.
Studies performed by
the Business Roundtable have determined that whether
your project is in the conceptual planning stage, bidding
stage, or during construction, that an improvement in
project performance could be realized with the implementation
of Critical Path Method (CPM) scheduling.
Whether our clients are
fulfilling contractual requirements or simply executing
good management practices, Synergen Consulting can provide
the essential CPM scheduling and progress management
service tools necessary. Our services include schedule
development and preparation, schedule analysis, schedule
updating, and progress reporting based on actual project
progress.
Our work products and
deliverables are prepared using the latest versions
of the established industry software such as Primavera®
Project Planner (P3), SureTrak®, and MS Project®.
|