Site Map           
Corporate Profile Project Profile Industry Profile Client Profile
Construction Expertise Financial Expertise Electronic Brochure Video Presentation
Construction Expertise
Project and Construction Management
Program Management
Project Management
Staff Extension
Troubled Project Turn Around
Scheduling and Project Controls <
Cost Estimating
Cost Accounting and Control
Procurement
Engineering and Design Development
Project Start-Up and Close-Out
Construction Inspection
Risk Management
Construction and Project Training
Initial Decision Maker
Claims and Litigation Consulting
Claim Evaluation / Preparation / Resolution
Construction Defect Analysis
Design Performance / Certificate of Merit
CPM Schedule / Delay Analysis
Damages Quantification / Evaluation
Labor / Productivity Analysis
Risk Evaluation / Analysis
Project Review and Audit
Position Presentation / Negotiation
Computer Applications / Graphics / Multimedia
Education / Seminars
Litigation / Arbitration / Mediation Assistance
Financial Expertise
Lender and Acquisition Services
Pre-Financing / Pre-Acquisition Due Dilligence
Acquisitions
Troubled Projects
Corporate Services
Project Financing
Project Development
Performance Improvement
Process Improvement
Restructuring and Privatization
Asset Valuation and Appraisals
Business Consulting
Operations Management
Corporate Finance
Business and Accounting Litigation Services
Financial Damage Analysis / Damage Models
Commercial Disputes
Intellectual Property

Scheduling and Project Controls

Project management control can only be achieved when cost, schedule, and technical objectives are clearly documented, realistically derived, and deliberately managed. Project schedule development is one of the most important processes in your project's overall plan development. However, a project will generally never follow the plan exactly and even the most well thought-out project schedules will inevitably exhibit variances between the planned and actual performance. Therefore, in order to prevent these variances from significantly disrupting the project, a process for continual control and monitoring must be implemented from the project's outset. Synergen Consulting is able to assist our clients at any stage of a project, as we can not only measure current performance status but also forecast potential problems. Regulating variances can mean the difference between the success and failure of your project.

Studies performed by the Business Roundtable have determined that whether your project is in the conceptual planning stage, bidding stage, or during construction, that an improvement in project performance could be realized with the implementation of Critical Path Method (CPM) scheduling.

Whether our clients are fulfilling contractual requirements or simply executing good management practices, Synergen Consulting can provide the essential CPM scheduling and progress management service tools necessary. Our services include schedule development and preparation, schedule analysis, schedule updating, and progress reporting based on actual project progress.

Our work products and deliverables are prepared using the latest versions of the established industry software such as Primavera® Project Planner (P3), SureTrak®, and MS Project®.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Newsletter
 
 
 
Contact Us
 
 
 
 

 

:: Contact :: News :: Research :: Employment :: Legal
   
Scheduling and Project Controls
©2008 Synergen Consulting International, All Rights Reserved | 800.701.4248